
Add to Cart
Professional Performance Aluminum Alloy Rack, Strong, Durable And Solid Structure PP Shoe Cover Making Machine
Machine Feature
Main Technical Parameters
Type | NB-005 |
Capacity (pieces/min) | 100-120 |
Power Source | AC220V 1PH 50Hz |
Motor Capacity KW | 1.1 |
Gear Reduction Ratio: | 1:10 |
Ultrasonic Power KW | 3.2KW |
Shoe cover size(L×W mm) | 410×(150-170) |
Shoe cover elastic size | 30-40# |
Dimensions (L×W×H mm) | 1900×1700×1560 |
Operating environment | Asepsis and purifying |
Ambient Temperature | -10—+26°
|
Features
1. Aluminum alloy rack, strong, durable and solid structure.
2. The imported ultrasonic system features a strong and stable power that is applicable to long-term continuous operation.
3. Easy to operate and convenient to maintain.
4. It runs smoothly, the fastest speed is 120 pieces per minute, and the product qualified rate is 99% and above.
5. Electronic counting, automatic shutdown at the set output. If the shoe strap is broken, the equipment will automatically stop.
6. Automatic feeding – nonwoven fabric binding and welding – nonwoven fabric folding – forming welding – cutting off – finished products output
7. Applicable to 25~40gsm thick nonwoven fabrics, 330~430mm wide raw materials.
Structure Diagrammatic Sketch
1. Driving Fraction
2. fusion cutting part
3 .non-woven fabric
4. shelf
5 .ultrasonic wave
6. elastic band welding part
7. feeding wheel
8. electric cabinet
9. elastic band
10 .ultrasonic wave control cabinet
After Service
1) Provide 24-hour service hotline.
2) Reply and find out solution within the shortest time according to customer’s requirement.
3) Provide on call service to help customer solve problems.
4) Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.
5) Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.
6) Provide one year guaranty and lifetime maintenance.
Company information:
Company Generation
Our Product
Non woven machinery:
PE machinery:
Cotton machinery:
FAQ:
1. Q: How is the after sales service?
A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).
2. Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.
3. Q: What’s the machine lead time?
A: For the standard machines, we can delivery within 20 days. If it is customized by customer(OEM), the lead time is 35-55 days.
Packing and delivery:
Payment and Shipemnt:
Warranty time | One year of quality guarantee for main parts |
Delivery time | 15 working days from down payment receipt. |
Terms of payment | After signing sales contract, T/T 30% down payment in 7 working days, the balance 70% paid by T/T before shipment after test run in the seller’s factory. |
Shipment | 1X40’GP |
Description