
Add to Cart
For Electronics Factory High Efficiency And Long Life-Span, Low Labor Consumption Shoe Cover Machine
Feature
1, the frame machine adopts aluminum alloy structure, beautiful and firm without rust.
2, with photoelectric detection, automatic counting function;
3, constant tension control of raw materials;
4, replacement of molds can produce different specifications of shoe covers or small bags.
Overview:
Machine details:
1. All process is fully automatic: feeding, welding, cutting and finished products;
2. Auto counting, auto stop when finish production or without elastic rubber;
3. The production speed cab be adjusted according to the practical need;
4. The highest capacity can reach 120 pcs/min;
5. High efficiency and long life-span, low labor consumption.
Technology:
Model | NB-006 |
Machine size | 2600mm*2100mm*1500mm (L*W*H) |
Package size | 2500mm*1200mm*1400mm(L*W*H) 1350mm*1000mm*1280mm(L*W*H) |
Speed | 130~160PCS/MIN |
Pressure | 220v/380v(According to customer requirement) |
Power | 3.8kw |
Machine Weight | 550kg |
Products size | 400*160mm(L*W)other size make according to customer requirement |
Use material | Rubble band,PE film |
About Finish product:
Most Size are 400×(150-170)mm
Factory Show:
Packing details:
FAQ:
1.Q: Are you trading company or manufacturer ?
A: Yes, We are factory, all machines are made by ourself and we can provide customize service according to your requirement.
2.Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to detailed request.
3.Q: Do you accept special design?
A: Yes,we accept design and manufacture products according to client's special requirements
4.Q: What about your warranty?
A: Our warranty is 1 year, all machine part can be replaced for free within 1year if broken(not including man made)
5.Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment
Payment and Shipemnt:
Warranty time | One year of quality guarantee for main parts |
Delivery time | 15 working days from down payment receipt. |
Terms of payment | After signing sales contract, T/T 30% down payment in 7 working days, the balance 70% paid by T/T before shipment after test run in the seller’s factory. |
Shipment | 1X40’GP |